2-5 through 8
January 23, 2017by Wm. Josiah Erikson (wjens)
One of the C6100’s, containing compute-2-5 through 2-8, rebooted 18 hours ago. I’m not entirely sure why yet, but if you saw runs mysteriously die, that’s why. It could be a power supply issue or it could be that side of the PDU got overloaded. I’ve moved it to the other side where there is 1A smaller power draw. If it does it again, I’ll replace the power supply.
February 24th, 2017 at 9:28 am
It did it again – time to replace the power supply.
February 24th, 2017 at 9:31 am
Replaced. It was pretty hot. I also put it in the other slot. We’ll see what happens now…
February 27th, 2017 at 3:40 pm
They died again. Time to replace the chassis?
February 27th, 2017 at 4:08 pm
Instead, I added the first power supply back in and plugged it into the Rack1 UPS. We’ll see what happens now… that put Rack1’s PDU up 2A, but didn’t decrease the other PDU significantly… odd… it’s at 14A right now, I think 15 is max
March 2nd, 2017 at 2:07 pm
It’s been good now at max load for several days